Bare Overhead Conductor Manufacturer for Distributors, Agents & Tender Partners
Engineer Reply Within 12 Hours · We Quote Through You, Never Around You

Bare Overhead Conductor Manufacturer for Project BOQs and Specs

Supporting contractors, subcontractors, engineering teams & tender support teams. Your quote, datasheet, and technical documents are built around your BOQ or spec, ready for your tender file and project delivery documents.

  • 12+ years manufacturing bare overhead conductors, with export experience across 50+ markets.
  • Documents prepared for tender file, PO review, and customs clearance.
  • Engineer replies within 12 hours to urgent tender file requests, confirming quote timeline or missing details.
  • CNAS reports shared where available; new testing can be arranged after scope, cost, and timing are confirmed.

No full BOQ yet? Send a code or spec — we'll confirm quote timeline or missing details.

BOQ- and Spec-Based Quotes, Conductor Clarifications, and Pre-PO Documents

Send your BOQ or spec — we organize the quotation, respond to conductor questions, and prepare pre-PO documents before order placement.

Quotes, Datasheets & Conductor Questions in One Project Thread

Your quote, datasheet, and any conductor questions stay in one project thread. Follow-up questions and revisions are logged there too, so changes stay tied to confirmed datasheet details.

Pre-PO Documents: Technical Datasheet and Draft PI

We organize the technical datasheet and draft PI. If a third-party report is required or requested, we confirm timing and cost separately.

Price Basis Clear in Quote. Formula Confirmed at PO.

We make the aluminum basis and conversion cost clear with the quote. The adjustment formula is confirmed at PO, and later changes are calculated by that formula, not reopened as new terms.

Listed Overhead Conductors and Related Wires We Quote

Select a product family below to view standards, key notes, and datasheet links. GSW, CCS, and HDBC are listed as related wire products, not aluminum conductor families. For code or wording not shown here, send it for review.

AAC Conductor

Standards: IEC 61089, ASTM B231, BS EN 50182, AS 1531, GB/T 1179

Key Note: In-house QC covers tensile, resistance, and wrapping checks.

Datasheet: Download (PDF)

Code or Wording Not Shown Here?

Send the code or wording from tender or project documents. Within 12 hours, we confirm listed-family match, missing details, and datasheet or quote timing.

Send Code or Spec for Review
No exact match? Send the project or tender wording.

Batch QC In-House. Third-Party Reports When Required.

Every production batch goes through in-house QC. Existing third-party reports are shared where available. New testing is arranged only after scope, cost, and timing are confirmed.

In-house QC — wire, strand & lay-length checks
Every production batch

Electrical Performance

PC36C · Class 0.05

DC resistance from 0.01 μΩ to 200 Ω with automatic temperature correction (0–40 °C).

GB/T 3048.4 IEC 60468 IEC 61089

Wire Strength

LDS-50 · 50 kN dual-column

Tensile testing for individual aluminum strands and galvanized-steel core wires before stranding.

GB/T 17048 GB/T 3428 ASTM B230

Wire Ductility

JR-N-16 · JWJ-10

Wrap and torsion on aluminum strand (0–6 mm) and galvanized steel core (0–4 mm); reverse-bend on wires 0.3–10 mm.

GB/T 3428 GB/T 238 ISO 7801

Stranding Accuracy

FYTY-80 · 20 MP CMOS

Vision-based wire diameter, conductor OD (1–80 mm), and lay-length verification, sampled drum-by-drum during stranding.

IEC 60811 IEC 61089 GB/T 2951.11
Third-party type testing — finished-conductor level
CNAS-accredited third-party labs

Type Test Reports for Finished Conductors

Finished-conductor type tests are verified by CNAS-accredited labs under ISO/IEC 17025 and the ILAC MRA framework, with reports used for utility and EPC procurement review where required.

Existing reports are shared where available. New third-party testing is arranged only after the required test scope, cost, and typical 4–8 week timing are confirmed.

Sample CNAS Reports

Sample CNAS reports shown here. For other codes, we confirm whether an existing file is available or new testing is required.

Management System Certificates

ISO certificates cover factory management systems, not individual conductor type tests.

ISO 9001 ISO 14001 ISO 45001
SGS, BV, TÜV or your appointed inspector can witness testing at our factory after test scope and schedule are confirmed.

From your client's spec to the bill of lading.

Spec confirmed

  • Technical Data Sheet (TDS)
  • Proforma Invoicedraft
  • CNAS Third-Party Reportif model on file

Order placed

  • Proforma Invoicecountersigned
  • Drum Schedulelocked
  • CNAS new-test commissionedif non-standard spec

In production

  • Mill Test Certificateper batch
  • CNAS report deliveredif newly tested
  • Packing Listdraft

Shipment loaded

  • Commercial Invoicefinal
  • Packing Listfinal
  • Declaration of Conformitysigned
  • Fumigation Certificate
  • Bill of Lading~48h after sail
  • Form E / Certificate of OriginCCPIT, ~7-10 days post-B/L

A real factory, built around your client's projects.

[ Photo: Stranding
line ]
[ Photo: Rod mill
/ drawing ]
[ Photo: Drum
packing & loading ]
[ Video poster
placeholder ]
Factory tour · 60s
State Grid of China
Qualified for China's hardest grid procurement screen. State Grid runs the world's largest power network. The same standards that get us on their drum get on the drum we ship to you.
3M km / year Annual capacity
50+ Countries Export markets
66,000 m² Factory floor
Since 2014 10+ years manufacturing

What we'll match for you.

Match your client's tender spec

We quote in the standard, code, and size your client wrote. Vietnam: 240/40, 330/43, 400/51. Myanmar: Drake, Duck, Tern, Bunting, Wolf, IBIS.

TCVN 5064 IEC 61089 BS 215 ASTM B232 GB/T 1179 EN 50182 DIN 48201 GOST 839

Steel core for corrosion and uprating

Galvanized for default lines. AW (aluminum-clad) for coastal corridors. HTLS to uprate existing lines without new towers.

Galvanized core ACSR/AW AACSR/AW TACSR/AW ACSS ACSS/TW Greased core

Customize drum type and length

Wooden, steel-wooden, or returnable steel. ISPM-15 fumigated. Single length per drum, cut to your client's tower schedule.

Wooden drum Steel-wooden Returnable steel ISPM-15 Custom length per drum

Your reference on every drum

Drum label carries your PO number, project code, and consignee. No relabelling at port. Standard markings stay per IEC / BS / ASTM.

Buyer PO no. Project code Consignee on drum Standard ID block kept

Photographed at the seal, notified at every step.

ZD Cable packaging and loading proof for sealed container shipment

Sealed Container Shipping

Bare aluminum corrodes if salt air touches it. Every drum ships in a sealed 20'GP, 40'GP, or 40'HQ. Never open-top or flat-rack.

Sealed Only 20'GP-40'HQ No Open-Top

Forwardable Loading Proof, Every Order

Before sealing, we send drum-by-drum photos showing bracing, drum orientation, ISPM-15 stamp, and your project reference.

Pre-Seal Photos Drum-by-Drum Forwardable PDF

5 Milestone Updates

You don't chase shipment status. We send 5 milestone updates, with CIF, CFR, FOB, and beneficiary details confirmed at quote stage.

5 Updates Pre-Quote Terms CIF-CFR-FOB

Milestone updates we push to you

Ready date
Production complete, drums staged for loading.
Loading date
Container packed. Photo pack sent.
ETD
Vessel sailing from Chinese port.
ETA
Arrival window at your destination port.
Shipping advice
B/L, full doc set, and final tracking pushed to you.

Questions distributors ask before they forward our quote.

A usable quote needs 6 items: conductor type or codename (e.g. Drake, IBIS, ACSR 240/40), reference standard (TCVN, IEC, ASTM, BS, GB), quantity (km or tonnes), single drum length, drum type (wooden / steel-wooden / steel), and destination port + Incoterm (CIF / CFR / FOB). Add any test reports your client's tender file requires. Send these together and we reply within 12 hours.
MOQ baseline is 1,000 metres. Lead time runs 7–30 days after PO depending on order size and current production calendar. Single drum length depends on conductor type and standard — larger cross-sections naturally take shorter drums. Send the type, cross-section, quantity, and your client's deadline and we'll come back with exact drum length and a lead-time window.
LC at sight and TT 30/70 (30% deposit, 70% against B/L copy) are our baseline. Smaller orders, repeat buyers, and framework agreements can move to other terms — we settle the specific clause at the quote stage based on order size and history.
Yes to both. Form E (China–ASEAN FTA preferential origin) is issued in our name for every shipment — your client uses it to claim preferential or zero ACFTA tariff. Wooden and steel-wooden drums carry the IPPC ISPM-15 stamp (heat-treated, required for both countries' customs entry). Returnable steel drums are available where you'd rather avoid the wood paperwork entirely.
Insurance is arranged at 110% of CIF value; ICC tier (A all-risk, B mid, C basic) is matched to your client at the quote stage. If a drum arrives damaged, the loading photo pack + mill certificate + packing record we ship to you let you open the claim with your client and insurer directly, not wait on us to mediate.

Send the code, spec, or BOQ — get back a quote you can forward as your own.

Engineers review your submission and reply with a datasheet, price basis, and validity window, ready to attach to your client's file.

[ Photo: Drums staged
for shipment ]
  • Goes to you only — never forwarded to your client
  • Engineers reply within 12 hours
  • Datasheet, price basis, and validity confirmed in writing

Request Partner Quote

Your project details are kept confidential and are never shared with your end client.