Bare Overhead Conductor Manufacturer for Distributors, Agents & Tender Partners
Engineer Reply Within 12 Hours · We Quote Through You, Never Around You

Bare Overhead Conductor Manufacturer for Project BOQs and Specs

Supporting contractors, subcontractors, engineering teams & tender support teams. Your quote, datasheet, and technical documents are built around your BOQ or spec, ready for your tender file and project delivery documents.

  • 12+ years manufacturing bare overhead conductors, with export experience across 50+ markets.
  • Documents prepared for tender file, PO review, and customs clearance.
  • Engineer replies within 12 hours to urgent tender file requests, confirming quote timeline or missing details.
  • CNAS reports shared where available; new testing can be arranged after scope, cost, and timing are confirmed.

No full BOQ yet? Send a code or spec — we'll confirm quote timeline or missing details.

BOQ- and Spec-Based Quotes, Conductor Clarifications, and Pre-PO Documents

Send your BOQ or spec — we organize the quotation, respond to conductor questions, and prepare pre-PO documents before order placement.

Quotes, Datasheets & Conductor Questions in One Project Thread

Your quote, datasheet, and any conductor questions stay in one project thread. Follow-up questions and revisions are logged there too, so changes stay tied to confirmed datasheet details.

Pre-PO Documents: Technical Datasheet and Draft PI

We organize the technical datasheet and draft PI. If a third-party report is required or requested, we confirm timing and cost separately.

Price Basis Clear in Quote. Formula Confirmed at PO.

We make the aluminum basis and conversion cost clear with the quote. The adjustment formula is confirmed at PO, and later changes are calculated by that formula, not reopened as new terms.

Listed Overhead Conductor Families We Quote

Select a product family below to view standards, key notes, and datasheet links. For code or wording not shown here, send it for review.

AAC Conductor

Standards: IEC 61089, ASTM B231, BS EN 50182, AS 1531, GB/T 1179

Key Note: In-house QC includes tensile, resistance, and wrapping checks.

Datasheet: Download (PDF)

Code or Wording Not Shown Here?

Send the code or wording from tender or project documents. Within 12 hours, we confirm listed-family match, missing details, and datasheet or quote timing.

Send Code or Spec for Review
No exact match? Send the project or tender wording.

In-House Batch QC and Third-Party Report Handling

Every production batch goes through in-house QC. Existing third-party reports are shared where available. New testing can be arranged after scope, cost, and timing are confirmed.

In-house QC — wire, strand & lay-length checks
Every production batch

Electrical Performance

PC36C · Class 0.05

DC resistance from 0.01 μΩ to 200 Ω with automatic temperature correction (0–40 °C).

GB/T 3048.4 IEC 60468 IEC 61089

Wire Strength

LDS-50 · 50 kN dual-column

Tensile testing for individual aluminum strands and galvanized-steel core wires before stranding.

GB/T 17048 GB/T 3428 ASTM B230

Wire Ductility

JR-N-16 · JWJ-10

Wrap and torsion on aluminum strand (0–6 mm) and galvanized steel core (0–4 mm); reverse-bend on wires 0.3–10 mm.

GB/T 3428 GB/T 238 ISO 7801

Stranding Accuracy

FYTY-80 · 20 MP CMOS

Vision-based wire diameter, conductor OD (1–80 mm), and lay-length verification, sampled during stranding.

IEC 60811 IEC 61089 GB/T 2951.11
Third-party type testing — finished-conductor level
CNAS-accredited third-party labs

Type Test Reports for Finished Conductors

Finished-conductor type tests are verified by CNAS-accredited labs under ISO/IEC 17025 and the ILAC MRA framework, with reports used for tender files and project review where required.

Existing reports are shared where available. New third-party testing can be arranged after the required test scope, cost, and typical 4–8 week timing are confirmed.

Sample CNAS Reports

Sample CNAS reports shown here are selected ACSR code examples, not full product-family coverage. For other conductor codes or families, we confirm whether an existing file is available, new testing can be arranged, or further review is needed.

Management System Certificates

ISO certificates cover factory management systems, not type test reports for individual conductor codes.

ISO 9001 ISO 14001 ISO 45001
SGS, BV, TÜV, or a project-appointed inspector can witness testing at our factory after test scope, cost, and schedule are confirmed.

From project spec to the bill of lading.

Spec confirmed

  • Technical Datasheet
  • Proforma Invoicedraft
  • CNAS Third-Party Reportavailability confirmed by conductor code or family

Order placed

  • Proforma Invoicecountersigned
  • Drum Schedulelocked
  • CNAS new-test requestsubject to scope, cost, and timing confirmation

Production started

  • Mill Test Certificateissued per completed batch
  • Packing Listdraft
  • Commercial Invoicedraft

Shipment loaded

  • Commercial Invoicefinal
  • Packing Listfinal
  • Declaration of Conformitysigned when required
  • Fumigation Certificatewood packaging only
  • Bill of Lading~48h after sail
  • Form E / Certificate of Originissued when applicable, ~7–10 days post-B/L

A real factory, built around your project requirements.

[ Photo: Stranding
line ]
[ Photo: Rod mill
/ drawing ]
[ Photo: Drum
packing & loading ]
[ Video poster
placeholder ]
Factory tour · 60s
State Grid of China
Qualified supplier for State Grid procurement. State Grid Corporation of China is the world's largest utility enterprise. The same production discipline behind State Grid supply also supports the conductors, documents, and batch-level QC we prepare for export projects.
3M km / year Annual capacity
50+ Countries Export markets
66,000 m² Factory floor
Since 2014 12+ years manufacturing

What we'll match for you.

Send your BOQ or spec and we confirm conductor match, steel core options, drum packaging, and project marking as part of your quote.

Match your BOQ or spec

We quote against the reference standard, conductor code, family, or size stated in your BOQ or spec. Code examples include numeric sizes and named conductors such as 240/40, 330/43, Drake, Duck, and IBIS.

TCVN 5064 IEC 61089 BS 215 ASTM B232 GB/T 1179 EN 50182 DIN 48201 GOST 839

Steel core for corrosion and uprating

Choose ACSR/AW or AACSR/AC for improved corrosion resistance, and TACSR or ACSS options to support existing-line uprating where project design allows. Final selection depends on line conditions and required standard.

Galvanized core ACSR/AW AACSR/AW TACSR/AW ACSS ACSS/TW Greased core

Customize drum type and length

Wooden, steel-wooden, and returnable steel drum options can be confirmed per order. ISPM-15 marking applies to regulated wood packaging. Single drum length is confirmed against conductor code, standard, cross-section, and project drum schedule.

Wooden drum Steel-wooden Returnable steel ISPM-15 Custom length per drum

Your reference on every drum

Project reference, drum number, and shipping mark can be printed on each drum to support checking during loading, customs review, and site receiving.

Buyer PO no. Project code Consignee on drum Standard ID block kept

Loading proof before sealing, shipment updates at five milestones.

ZD Cable packaging and loading proof for sealed container shipment

Sealed Container Shipping

Sealed-container shipping helps reduce salt-air exposure and corrosion risk for bare aluminum. Every drum ships in a sealed 20'GP, 40'GP, or 40'HQ. Never open-top or flat-rack.

Sealed Only 20'GP-40'HQ No Open-Top

Forwardable Loading Proof, Every Order

Before sealing, we send drum-by-drum photos showing bracing, drum orientation, your project reference, and ISPM-15 marking where regulated wood packaging requirements apply.

Pre-Seal Photos Drum-by-Drum Forwardable PDF

5 Milestone Updates

We send shipment updates at five key milestones, so status checks do not depend on back-and-forth follow-up. The applicable Incoterm and payment details are confirmed through the quote and PO process.

5 Updates Pre-Quote Terms CIF-CFR-FOB

Milestone updates we push to you

Ready date
Production complete, drums staged for loading.
Loading date
Container packed. Photo pack sent.
ETD
Vessel sailing from Chinese port.
ETA
Arrival window at your destination port.
Shipping advice
B/L, applicable post-shipment documents, and final tracking shared with you.

Common Questions on Quotes, Documents, and Shipping

Send conductor code, family, or size, reference standard, quantity, single drum length, drum type, destination port, and Incoterm. Add any test report requirements from tender or project documents. Within 12 hours, we confirm quote timeline or missing details.
MOQ baseline is 1,000 metres. Lead time runs 7–30 days after PO depending on order size and current production calendar. Single drum length depends on conductor code, standard, and cross-section. Send code, standard, cross-section, quantity, and required delivery date. We confirm drum length and lead-time window.
L/C at sight and T/T 30/70 are our baseline: 30% deposit and 70% against B/L copy. Other payment terms are confirmed case by case at the quote stage based on order size and project requirements.
Form E is issued when applicable for ACFTA destinations and after shipment details are confirmed. The importer can use it to claim preferential ACFTA tariff where eligible. Drums containing regulated wood packaging material need IPPC ISPM-15 marking when wood packaging requirements apply. Returnable steel drums are available if you want to avoid wood packaging paperwork.
Insurance is arranged at 110% of CIF value; ICC tier (A all-risk, B mid, C basic) is confirmed at the quote stage based on project requirements. If damage occurs, the loading photo pack, Mill Test Certificate, and Packing List support insurance claim review with the insurer.

Send the code, spec, or BOQ — get back a quote you can forward as your own.

Engineers review your submission and reply with a datasheet, price basis, and validity window, ready to attach to your client's file.

[ Photo: Drums staged
for shipment ]
  • Goes to you only — never forwarded to your client
  • Engineers reply within 12 hours
  • Datasheet, price basis, and validity confirmed in writing

Request Partner Quote

Your project details are kept confidential and are never shared with your end client.