Landing Page Header
ACSR conductors on a high-voltage transmission line corridor — manufactured by ZD Cable for utility and EPC projects worldwide
Source Factory · Henan, China

ACSR Conductor Manufacturer.
ASTM · IEC · BS EN · GOST.
Shipped to 50+ Countries.

3,000,000km/yr

Production Capacity

50+ Countries

Direct Export

250+ Codes

ASTM / IEC / BS / GOST

30 Days

Typical Lead Time

Most buyers reach us on WhatsApp for faster quotes.
24h Engineer Reply MOQ from 1,000 m MTC + CNAS Test Reports FOB / CIF / CIP / DDP
ACSR conductor cross-section showing six aluminum strands and galvanized steel core — manufactured by ZD Cable for utility and EPC projects
Manufactured to International Standards
IEC 61089 ASTM B232 BS EN 50182 AS 3607 GOST 839
Free engineering consultation

Not Sure Which ACSR Conductor Fits Your Project?

Tell us your project specs below — a senior engineer (not a sales template) replies with a 2–3 ACSR model shortlist plus LME-locked aluminum pricing within 24h.

Prefer instant chat? Send your specs on WhatsApp →

Senior engineer reviews your spec LME-locked aluminum pricing NDA available before sharing details

ACSR Conductor Specifications & Cross-Reference

Look up 250+ ACSR conductor codes across 7 international standards — Drake / Zebra / 400-AL1/52 / AC 400/51 cross-referenced in one table. Source factory in Henan, China — all sizes manufacturable to project specification, MOQ 1,000 m.

Overall Diameter
Mass / Weight
Rated Strength
DC Resistance (20°C)
The ZD Cable Advantage

Secure Your ACSR Budget & Quality.

Two things quietly eat margin on ACSR conductor projects: aluminum price swings between order and shipment, and spec confusion across IEC, ASTM, BS, DIN and GB standards. We help you control both.

Aluminum Price Lock

Aluminum is the largest cost variable in any ACSR conductor order. Once your deposit is received, we immediately procure the aluminum rod against the day's LME or SMM Changjiang spot price — from that point your material cost is fixed, regardless of where the market goes during production.

Cross-Standard Spec Verification

Different projects reference different standards — IEC 61089, ASTM B232, BS EN 50182, DIN 48204, GB 1179. Our engineers verify the conductor designation in your spec sheet matches the standard your project actually requires, before we cut a single meter — so you don't pay to ship the wrong product.

Overhead Conductor Export Track Record

Real ACSR, AAC and bare conductor shipments delivered to utility and EPC customers across Asia and Africa — each completed on spec, on schedule, and to the standard the destination market required.

450 km of ACSR 400/51 conductor manufactured by ZD Cable for the 500 kV Lao Cai–Vinh Yen transmission line in Vietnam Vietnam
ACSR · 400/51 2026 Q2 — In Progress

500 kV ACSR Conductor for the Lao Cai–Vinh Yen Transmission Line

Volume 450 km
Lead Time 30 days
Standard IEC 61089
1,000 km of AAC all-aluminum overhead bare conductor exported to Southeast Asia for transmission line projects Indonesia
AAC · All Aluminum Dec 2025

1,000 km All-Aluminum Overhead Bare Conductor for Transmission

Volume 1,000 km
Lead Time 25 days
Standard BS EN 50182
ACSR and HDBC bare conductors shipped to Mozambique for grid expansion and rural electrification Mozambique
ACSR · HDBC Feb 2026

Bare Conductor Package for Grid Expansion & Rural Lines

Volume 300 km
Lead Time 30 days
Standard IEC 61089

Verified ACSR Manufacturing Performance

Every ACSR conductor we produce — drawn, stranded, type-tested — meets the standard your destination market enforces. From ASTM to GOST, with CNAS test reports for tested models.

ACSR Conductor Manufacturing Standards
IEC 61089
ASTM B 232
BS EN 50182
AS 3607
GOST 839
360° AVAILABLE

Walk Our ACSR Factory. Talk to Our Engineers.

Skip the middleman markup. Inspect our ACSR conductor production line yourself — anytime, via a 360° virtual tour or a live video call with our stranding and quality engineers.

360° tour opens on Alibaba 1688 — visual content only, no Chinese needed to navigate.

CNAS-accredited laboratory conducting type tests on ACSR conductor samples Compliance

CNAS Test Reports on Request

Key ACSR models passed Type Tests in independent CNAS-accredited laboratories. Project-level testing available upon request.

Reinforced steel-wood drums loaded with ACSR conductor reels, ready for ocean export Packaging

Export-Grade Conductor Drums

Reinforced steel-wood drums sized for ACSR coil weights, built to withstand 30+ days of ocean transit without crushing or moisture damage.

Order Process · ACSR Conductor

Your ACSR Order, From Inquiry to Delivery in 6 Steps

Every ACSR conductor order follows the same process — photographed, reported, and signed off at each stage before we move to the next. Typical cycle: ~40 days from PI to ETD, with a full document trail.

Day 0–1
Step 01 / 06

Technical Clarification

Our engineer reviews your spec sheet against the standard you reference (ASTM, BS, IEC, GOST or GB) and confirms the conductor designation matches your project requirement before we quote — nothing lost in translation.

Deliverable Confirmed technical drawing + BOM (PDF)
Day 2–3
Step 02 / 06

Formal Quotation

Itemized Proforma Invoice with material, freight, Incoterms (FOB / CIF / CFR / DDP), and ETD. Payment terms negotiated upfront — no surprises on the final invoice.

Deliverable Signed Proforma Invoice + payment schedule
Day 3–5
Step 03 / 06

Production Kickoff

Deposit confirmed. Aluminum rod and steel core sourced for your order, and your production slot is locked in on the factory calendar.

Deliverable Production schedule + first in-process photos
Day 10–30
Step 04 / 06

In-Process QC

Three QC checkpoints — stranding, surface finish, drum winding. Photo and video reports of each checkpoint shared with you for review. Flag any concern and we review with engineering before moving to the next stage.

Deliverable QC photo & video reports per checkpoint
Day ~38
Step 05 / 06

Pre-Shipment Inspection

Factory Acceptance Test run to your spec's standard (IEC / ASTM / GOST / GB). Third-party inspection (CNAS / SGS) can be arranged at your request.

Deliverable FAT report + Certificate of Conformance
Day 40+
Step 06 / 06

Shipment & Support

Container booked, BL / AWB shared. Carrier tracking link forwarded so you know where your shipment is. Full document pack ready for customs clearance at destination port. Direct line to your account manager until arrival.

Deliverable Export doc bundle + dedicated account manager
REQUEST A QUOTE

Talk With Our Expert

Ready to Scale Your Business?

Cable industry workforce in branded navy polo shirts posing on steps of modern corporate facility with grand columns
ZD Cable Footer